Kirti Nagar Madhuban Chowk (earlier Pitampura) Metro Route

⇄ Reverse Route
💰 ₹32 Token
💳 ₹29 Smart Card
⏱ 24 min
🚉 9 stations
📍 9.5 km
🔄 1 interchange

📍 Route Overview

The Delhi Metro route from Kirti Nagar to Madhuban Chowk (earlier Pitampura) covers approximately 9.5 km with a travel time of approximately 24 minutes. The journey passes through 9 stations and requires 1 interchange.

🚇 Metro Lines Used

Green Line Branch
🌅 First Train: 5:15 AM
🌙 Last Train: 11:00 PM
⏱ Frequency: 6-10 minutes
Green Line
🌅 First Train: 5:15 AM
🌙 Last Train: 11:30 PM
⏱ Frequency: 4-7 minutes
Red Line
🌅 First Train: 5:00 AM
🌙 Last Train: 11:30 PM
⏱ Frequency: 4-6 minutes

💰 Fare Information

Ticket TypeFareNotes
Token / QR Code₹32Buy at counter or token machine
Smart Card₹2910% discount on token fare
Smart Card Off-Peak₹2320% discount (off-peak hours)
Holiday / Sunday₹32Same as token fare
Tourist Card (1 Day)₹200Unlimited travel for 1 day
Tourist Card (3 Days)₹500Unlimited travel for 3 days

🗺️ Step-by-Step Route — Station List

Kirti Nagar GRN-B Platform 2 → Towards ASHOK PARK MAIN
Satguru Ram Singh Marg GRN-B Platform 2 → Towards ASHOK PARK MAIN
Ashok Park Main GRN-B Platform 3 → Towards ASHOK PARK MAIN
Inderlok GRN Platform 3 → Towards INDERLOK
Kanhaiya Nagar RED Platform 1 → Towards RITHALA
Keshav Puram RED Platform 1 → Towards RITHALA
Netaji Subhash Place RED Platform 1 → Towards RITHALA
Kohat Enclave RED Platform 1 → Towards RITHALA
Madhuban Chowk (earlier Pitampura) RED Platform 1 → Towards RITHALA

🔄 Interchange Stations

Inderlok — Change from Green Line to Red Line

💡 Travel Tips

  • Buy a Smart Card to save 10% on every journey.
  • Keep your Smart Card balance above ₹50 to avoid rejection at the gate.
  • Download the Delhi Metro Rail app for real-time updates.
  • Avoid peak hours (8–10 AM and 5–8 PM) for a comfortable journey.
  • At interchange stations, follow the signboards carefully — they are colour-coded by metro line.

🔍 Interactive Route Finder

Get step-by-step directions, platform numbers and fares using the full interactive finder.

Find Route from Kirti Nagar to Madhuban Chowk Earlier Pitampura

Opens in a new tab · Full metro map, platform numbers & interchange guide

🗺️ Complete Journey Guide: Kirti Nagar to Madhuban Chowk (earlier Pitampura)

Travelling from Kirti Nagar to Madhuban Chowk (earlier Pitampura) by Delhi Metro covers 9.5 km across 9 stations in approximately 24 minutes. This journey requires 1 interchange. Follow the colour-coded signboards inside the station to reach the correct platform for your connecting train.

The token fare is ₹32 and Smart Card fare is ₹29 (10% discount). Kirti Nagar is an elevated station. The first train on this route departs around 5:15 AM and the last train runs till approximately 11:00 PM.

Interchange guide: At Inderlok, alight from the Green Line (Platform 3) and board the Red Line (Platform 1).

💡 Passenger Tips for This Route

💳 Use Smart Card
Save ₹3 on this trip. Load ₹500+ for best value.
⏰ Off-Peak Travel
Travel before 8 AM or after 9 PM for 20% extra Smart Card discount.
🚉 Board Correctly
Check platform direction before boarding — 9 stations, 9.5 km journey.
🔄 Interchange
Follow colour-coded signs. Allow 3–5 min for platform change at interchange.
📱 DMRC App
Download official DMRC app for real-time train tracking and Smart Card recharge.
🎫 Tourist Card
Visiting Delhi? ₹200/day or ₹500/3-day unlimited travel card available.

❓ Frequently Asked Questions

How many stations are there from Kirti Nagar to Madhuban Chowk (earlier Pitampura)?

There are 9 stations between Kirti Nagar and Madhuban Chowk (earlier Pitampura), covering a distance of 9.5 km.

What is the metro fare from Kirti Nagar to Madhuban Chowk (earlier Pitampura)?

Token/QR fare: ₹32. Smart Card fare: ₹29 (10% discount). Off-peak Smart Card: ₹23 (20% discount). Tourist Card: ₹200/day unlimited or ₹500 for 3 days.

How long does the metro take from Kirti Nagar to Madhuban Chowk (earlier Pitampura)?

The journey takes approximately 24 minutes covering 9.5 km across 9 stations with 1 interchange.

Is there a direct metro from Kirti Nagar to Madhuban Chowk (earlier Pitampura)?

No direct route — this journey requires 1 interchange. Change trains at Inderlok.

What is the first and last metro from Kirti Nagar to Madhuban Chowk (earlier Pitampura)?

Green Line Branch: First train 5:15 AM, last train 11:00 PM, every 6-10 minutes. Green Line: First train 5:15 AM, last train 11:30 PM, every 4-7 minutes. Red Line: First train 5:00 AM, last train 11:30 PM, every 4-6 minutes.

Which metro line goes from Kirti Nagar to Madhuban Chowk (earlier Pitampura)?

This route uses the Green Line Branch and Green Line and Red Line. You need to change trains at Inderlok.